DRIFT LAKE and DAM / 04-Drift Lake Stabilization, crew cut through dam and removed outlet pipe
Stabilization and HAER Photos


Previous Home Next

04-Drift Lake Stabilization, crew cut through dam and removed outlet pipe

04-Drift Lake Stabilization, crew cut through dam and removed outlet pipe.jpg