Provo River Restoration Project Photo Gallery Page Header
Left space of pagetop header navigationLink to return to Home PageLink to PRRP PageLink to projects by watershed pageLink to Wetlands Projects PageLink to Hatchery Projects PageLink to Native Species PageRight space of pagetop header navigation
Big Left space of navigation section

Reach 9 Photo Gallery 2002
Small Left space of navigation section

[Return to PRRP Photo Gallery]

reach
Reach 9 September 2002
river
River by-pass channel and culvert crossing
reach
Harvesting cobble and river bed preparation
backhoe
Excavating Reach 9 northern meander
excavating
Exacavating Reach 9 northern meander
excavating
Excavating Reach 9 northern meander
north
Northern meander reconnection to river
Reach
Completed Reach 9 Meander
Reach
Backhoes working in Reach 9
Reach
Reach 9 Excavation
salvaging
Salvaging fish from abandoned channel
salvaged
Fish salvaged from abandoned channel
salvaged
Fish salvaged from abandoned channel
reach
Reach 9 Before and After Construction
reach
Reach 9 Before and During Construction
reach
Reach 9 Before and After Construction
   
 
Email Link to the Utah Reclamation Mitigation Conservation Commission, urmcc@uc.usbr.govAddress for Utah Reclamation Mitigation Conservation Commission, 230 South 500 East, Suite 230, Salt Lake City, Utah 84102-2045, (801)524-3146, Fax (801)524-3148