high mountain lakes stabilization project
Left space of pagetop header navigationLink to return to Home PageLink to UBRP PageLink to projects photosLink to Links PageLink to Documents PageRight space of pagetop header navigation
Big Left space of navigation section
Small Left space of navigation section
Selection Marker ImageEarly Life in the Uintas
Selection Marker ImageIrrigation Developments
Selection Marker ImageHistoric Dam Construction
Selection Marker ImagePurpose of Stabilizing the High Lakes
Selection Marker ImageStabilization Process

DOCUMENTS

A Cultural Resource Inventory of Farmers, Deer, White Miller, East Timothy, Water Lily, Five Point, Drift, Bluebell and Superior Lakes for the Section 203 High Mountain Lakes Stabilization Project, Duchesne County, Utah. August 22, 2002 (16.8MB pdf)

A Cultral Resource Inventory of Brown Duck, Clements, Island and Kidney Lakes for the Section 203 High Mountain Lake Stabilization Project, Duchesne County, Utah. April 13, 2001 (6,025KB pdf)

Data Recovery at Six Prehistoric Sites, Uinta Basin Replacement Project, Bonneville Unit, Central Utah Project, Duchesne County, Utah. March 2, 2009 (3,691KB pdf)

Beyond the Wasatch - The History of Irrigation in the Uinta Basin and Upper Provo River Area of Utah (8,937KB pdf)

HABS/HAER Inventories and Summary Table (4,431KB pdf)

National Register of Historic Places Inventory Determination of Eligibility Request and Nomination Form (2,240KB pdf)

Memorandum of Agreement among the U.S. Department of the Interior, Utah Reclamation Mitigation and Conservation Commission, U.S. Department of Agriculture, Forest Service, Ashley National Forest and the Utah State Historic Preservation Officer regarding the Stabilization of Thirteen High Mountain Lakes, Uinta Basin Replacement Project, Bonneville Unit, Central Utah Project, Duchesne County and Uintah County, Utah (1,394KB pdf)

Uintah Basin Replacement Project, An Overview of Environmental Mitigation with Emphasis on the Stabilization of Thirteen High Mountain Lakes Presentation (4,740KB pdf)

High Mountain Lakes On-Site Interpretive Panels: Yellowstone Watershed, Lake Fork Watershed, Garfield Basin (2,837KB pdf)

History of Three Mountain Reservoirs, by Carolyn Winterton (70KB pdf)

High Lakes Stabilization Clements Lake, Brown Duck Basin Technical Memorandum, June 2007 (2,323KB pdf)

High Lakes Stabilization Clements Lake Construction Report, October 2008 (2,058KB pdf)

High Lakes Stabilization Technical Memorandum Swift Creek Drainage Lakes, June 2006 (2,242KB pdf)

High Lakes Stabilization Project Construction Report, Swift Creek Basin, Water Lily Lake, Farmers Lake, White Miller Lake, September 2008 (1,904KB pdf)

High Lakes Stabilization Brown Duck and Island Lakes Technical Memorandum, January 2008 (13,143KB pdf)

High Lakes Stabilization Brown Duck and Island Lakes Construction Report, January 2010 (2,258KB pdf)

High Lakes Stabilization Technical Memorandum Kidney Lake, April 2009 (3,369KB pdf)

High Lakes Stabilization Construction Report Kidney Lake, March 2010 (1,383KB pdf)

High Lakes Stabilization Technical Memorandum Garfield Basin Lakes, Superior, Five Point, Drift and Bluebell, April 2009 (2,321KB pdf)

High Lakes Stabilization Construction Report Garfield Basin, Five Point Lake, Bluebell Lake, Drift Lake, Superior Lake, January 2010 (2,739KB pdf)

High Lakes Stabilization Technical Memorandum Swift Creek Drainage, Deer Lake and East Timothy Lake, January 2010 (2,228KB pdf)

High Lakes Stabilization Construction Report Deer Lake, November 2010 (1,927KB pdf)

High Lakes Stabilization Construction Report East Timothy Lake, November 2010 (3,704KB pdf)

 

Ashley National Forest Home Page
Dept of Natural Resources Home Page
contact us Dept of Interior home page cuwcd home page MLWUA small business info Mitigation Commission Home Page Bureau of Reclamation Provo Office
dcwcd home page